| The
growing population and Industrialization has augmented
the power and water requirements.
-
Demand for power is rising by 4.5 percent a year.
Over the next 20 years, electricity generation capacity
needs to be increased from 17,000 megawatts to 67,000
megawatts. About 23,000 miles of new transmission
lines also need to be laid and a sophisticated national
grid needs to be put in place. The total cost is
going to come to about $117 billion." (Source
- International Spotlight - Washington post {Power
play - Saudi Arabia - Profile}.)
-
Saudi Arabia relies on desalination to help meet
the large demand for water and has become the world's
largest producer of desalinated water, producing
30 percent of the world's capacity, it currently
generates 3,600MW of electric power by desalination,
and experts believe this to touch the 5,000MW when
the new desalination and power plants are on stream.
Zedan Group has the know-how to capitalize on the opportunities
that come with the above scenario having access to the
most advanced technology through its network of joint
ventures and partnerships.
|